Ningbo, China · GMT+8 Mon–Fri 08:30–18:00

Ningbo LSW Corp — since 2010

The parts that hold prefabricated buildings together.

Lifting anchors, connection hardware and dry-floor systems, engineered in Ningbo and shipped to precast plants and builders in more than 130 countries.

A prefabricated LSW living unit with full-height glazing

Fig. 01Modular unit — dry interior system

130+Export countries
20+Product series
3Factory bases
560+Customers served

03System

A floor that levels itself, without wet trades.

Developed in 2018, when the technical team moved from hardware into interiors. A pedestal grid carries cement-fibre panels; the void underneath stays open for pipes and cables, and every panel can be lifted again for maintenance.

See the system
Section detail of the single-panel raised floor system
Section — single-panel system, schematic Click to enlarge
01

20 mm panel, 1 mm barrier

Cement-fibre panel over a damp-proof mat; timber or SPC finish by others.

02

50–80 mm service void

Adjustable pedestals at 400 mm centres; pipes stay reachable from above.

03

≈ 25 m² per person per day

No screed, no curing time; walkable as soon as the last panel goes down.

See the system

05Why LSW

A factory group,
not a trading desk.

Founded in 2010 by three partners who still run the technical side of the business.

01

Source factory

Three factory bases in Zhejiang cover machining, welding, galvanising and assembly. No middle trader between the drawing and the pallet.

02

Engineering review

Anchor positions and load cases are checked against the reinforcement drawing before tooling is cut. Ask for the review sheet with your quote.

03

Batch traceability

Every lot keeps its steel mill certificate, heat number and load-test report, so a claim can be traced back to the cast.

04

Export handling

FOB Ningbo, CIF or DDP. Packing is designed for sea freight and mixed containers, with pallets that fit a 40HQ without air.

06Process

From drawing
to container.

Standard parts ship from stock. Custom parts follow the same five steps, with a named engineer on the file.

STEP 01

Drawing review

PDF, STEP or a photo of a sample. We check tolerances and material grade.

24 h

STEP 02

DFM and quote

A costed route: machining, coating, packing. Open questions listed in writing.

48 h

STEP 03

Sample

First article with dimensional report, sent by courier before mass production.

7–10 d

STEP 04

Production

Batch cards on the line, in-process checks every two hours, photos on request.

15–25 d

STEP 05

Inspection and shipping

AQL 1.0 final inspection, packing list and photos before the container is sealed.

3 d

07Compliance

Paperwork that clears customs and QA.

The quality management system is certified to ISO 9001:2015 (GB/T 19001-2016) by Qide Certification: certificate 79426Q00151R0374, issued 5 August 2026, valid until 4 August 2029.

The dry floor system is protected by four utility model patents: one covers the system as a whole (ZL 2020 2 1785227.9), two cover the screw anchors and one covers the sheet-metal part and support assembly.

ISO 9001:2015GB/T 19001-2016CNAS C374-MUtility model patents

Test reports

SGS REACH SVHC screening, 235 substancesPDF NGBHL23004945901 2023-10-27 No SVHC above 0.1% (w/w)
GQT Raised floor system, GB/T 36340-2018 建委2021-07-0912 2021-07-23 All tested items meet the specification
Ningbo QTI Dry floor adjusting screw M10×50–80, GB/T 7314-2017 FXW20233379 2023-09-22 Compression values reported

Material certificates, load-test reports and coating records travel with the shipping documents. Click any document to read the full certificate.

Have a drawing? We’ll quote it in 24 hours.

Send a drawing Email an engineer

FOB Ningbo · MOQ from 500 pcs · Samples in 7 days